Back to case studies
Upgrade to an Existing Energy Management Project
A6.EnergyUpgrade to an existing project

Upgrade to an Existing Energy Management Project

Keep the meters; add alert and cost-analysis views.

Case ID
ESG-06
Module
A6.Energy
Application
Upgrade to an existing project
Industry
Existing energy-management site
  • Upgrade
  • ENPI
  • Alert center
SHEET 01 · Case story

Keep the meters; add alert and cost-analysis views.

The existing energy-management site retains its meter data sources and adds energy overviews, ENPI, alerts and reports to fill gaps in the system's management view.

SHEET 02 · Challenge and response

From the site problem to a system approach.

  1. 01The challenge

    Existing energy data and reporting flows are usable, but lack fuller alert, ENPI and cost views.

  2. 02The system approach

    Add energy overviews, ENPI, an alert center, reports and system-settings views.

  3. 03Reported outcome

    Move existing monitoring from data collection toward a management decision tool.

SHEET 03 · Architecture

System architecture and data flow.

Retain the existing meter data sources while extending platform analysis and management outputs. Source diagrams retain some original Traditional Chinese labels.

L4應用層Application
L3 → L4:REST API · WebSocket · LINE Webhook
L3雲端層Cloud
L2 → L3:TCP/IP over HTTPS
L2邊緣層Edge
L1 → L2:Modbus TCP / MQTT / API
L1表計層Metering
Data flows upward
    • 能源 Dashboard
    • ENPI 分析
    • 異常耗能告警
    • ESG 報表
    • CaseManagement-view reports
    • Energy Database
    • ENPI Model
    • Alert Rules
    • Carbon Factors
    • Report Engine
    • CaseENPI and alerts
    • Energy Gateway
    • 既有平台 Box
    • 本地資料暫存
    • 智慧電表
    • 水表 / 熱量表
    • 設備耗能
    • 站點 / 部門
    • CaseRetained meter data sources
SHEET 04 · Wiring and hardware

Wiring diagrams and hardware configuration.

The diagram outlines data flow between site signals, edge devices, the network and the platform. Confirm installation and connection scope before work begins.

Original diagram notes (Traditional Chinese)
  1. 01主機櫃 / Main equipment cabinet 內含 24VDC PSU、既有平台 Box、Energy Gateway
  2. 0224VDC PSU(100~240VAC, 單相 / DC 24V / 5A / 工業電源)以 24VDC 紅虛線供電給 既有平台 Box 與 Energy Gateway
  3. 03既有平台 Box(IPC / HMI / Switch、本地資料整理、斷網本地暫存)與 Energy Gateway(RS485 / Modbus TCP、能源表計採集)以 Modbus TCP / MQTT 藍線連接
  4. 04既有平台 Box 上行至 既有平台 Cloud(部署於雲端 / 台灣):TCP/IP over HTTPS via customer LAN(綠線)
  5. 054× 現場訊號 / 表計 / 感測器資料以橙線接入 Energy Gateway:表計 A(智慧電表,Modbus);表計 B(水 / 熱量表,RS485);設備 C(設備耗能,API / Meter);站點 D(部門 / 成本中心,Excel / API)

TOTAL既有平台 Box + Energy Gateway + 現場點位 / 表計 / 感測器 = ESG 基準配置

Original diagram legend藍線 = Ethernet / Modbus TCP / TCP-IP;綠線 = HTTPS / TCP-IP (Cloud Uplink);橙線 = 智慧電表 / 水表 / 熱量表 / 設備能源資料;紅虛線 = 24VDC Power / 低壓電源Planning reference with Traditional Chinese labels. Confirm wire colors, terminals, power and communications against site-approved documents.
SHEET 05 · Before implementation

What to confirm before work begins.

This material describes a planning direction. Confirm site points, installation, report definitions and alert rules against actual site conditions.

  1. 01Site points and signal sources
  2. 02Communication protocols and network conditions
  3. 03Power, panels and installation method
  4. 04Report fields and data definitions
  5. 05Alert rules and responsible people
  6. 06Equipment brands, models and quantities

END · Next step

What would you most like to solve on site?

An equipment list, a panel photo or a problem you face every day is enough to start.

  1. 01An equipment list
  2. 02A panel photo
  3. 03A problem you face every day