A6.Environment · Environment

Environment and thermal risk

Review environmental readings alongside when unusual conditions occur.

Review environmental readings alongside when unusual conditions occur. Confirm sensors, thresholds and alert workflows for each project.

A6Platform · confirm functions and integration scope on site.

A6Platform Environment war room screen (UI shown in Traditional Chinese)
A6PLATFORM · A6.ENVIRONMENTUI shown in Traditional Chinese
SHEET 01 · Pain to platform

From floor problems to platform responses.

  1. 01Site challenge

    Changes between inspections can be hard to trace after the fact.

  2. 02A6 area

    Review environmental readings alongside when unusual conditions occur. Confirm sensors, thresholds and alert workflows for each project.

Confirm actual data and functions for each project.

  • Site conditions
  • Busbar temperature
  • Indoor air quality
  • Event tracking
SHEET 02 · Architecture

System architecture and connection references.

Environment Gateway and sensor layouts are planning references. Confirm data sources, monitoring thresholds and alert workflows for each project.

Confirm brands, models, quantities and cable specifications against site conditions.

FIG.01 · ARCHITECTUREArchitecture · Reference Architecture reference.
  1. L1 · FIELDSite signalsReview machines, sensors, meters and operator-entered status; confirm data availability.
  2. L2 · EDGEEdge collectionConfirm how edge equipment can collect and transmit signals on site.
  3. L3 · PLATFORMPlatform modelEquipment, sites, alerts, reports and permissions.
  4. L4 · OUTPUTManagement viewsConfirm the actual scope of dashboards, displays and reports.
FIG.02 · WIRINGWiring · Reference This is a wiring plan. Review site equipment, sensors and signal configuration for each project.
FIG.03 · HARDWAREHardware · Reference This is a hardware reference. Confirm brands, models and quantities against site conditions.
SHEET 04 · Scope

Items to review on site.

Confirm points, connections and alert conditions on site.

  • CO₂
  • PM2.5 / PM10
  • TVOC
  • Formaldehyde
  • Noise
  • Temperature and humidity
  • Illuminance
  • Pressure
  • Airflow
  • Controlled-area access
  • Chemical inventory
  • Waste quantities
  1. STEP 01Review site conditions
  2. STEP 02Confirm signals and hardware
  3. STEP 03Define platform views
  4. STEP 04Confirm alerts and reports
A6.AI

Ask the floor in plain language.

Environment management. AI proposes. You approve.

Talk about your use case

END · Next step

What would you most like to solve on site?

An equipment list, a panel photo or a problem you face every day is enough to start.

  1. 01An equipment list
  2. 02A panel photo
  3. 03A problem you face every day