
Taiwan Edition Motor Health Monitoring
- Case ID
- PHM-03
- Module
- A6.Condition
- Application
- Equipment fleet management
- Industry
- Pumps and motors at a chemical plant
As the equipment list grows, keep settings and records together.
The chemical plant brings pump and motor lists, sensor settings and alert thresholds together. Maintenance staff can review condition by area and look up each asset's settings and maintenance records.
From the site problem to a system approach.
- 01The challenge
As the equipment fleet grows, maintenance records, alert thresholds and sensor configurations can become scattered.
- 02The system approach
Manage the equipment list, sensor settings, health rankings and alert rules together.
- 03Reported outcome
Move equipment management from single-point monitoring toward fleet management.
System architecture and data flow.
Edge devices map sensors to equipment identifiers; the platform maintains the data model and alert logic. Source diagrams retain some original Traditional Chinese labels.
- 設備 Dashboard
- 預警推播
- 維修建議
- 報表匯出
- CaseCondition by area
- 設備 Dashboard健康度排行 · 異常趨勢
- 預警推播溫度 / 震動 · 異常通知
- 維修建議優先序 · 保養排程
- 報表匯出設備履歷 · 維護紀錄
- Case signalCondition by areaSource|Case story:The chemical plant brings pump and motor lists, sensor settings and alert thresholds together. Maintenance staff can review condition by area and look up each asset's settings and maintenance records.
REST API · WebSocket · LINE Webhook- Equipment Health
- Spectrum Analysis
- Trend Database
- Alert Rules
- Maintenance Reports
- CaseSensor settings and thresholds
- Equipment Health健康分數 · 設備排行
- Spectrum Analysis震動頻譜 · 異常特徵
- Trend Database長期趨勢 · 劣化判讀
- Alert Rules門檻 / 等級 · 告警推播
- Maintenance Reports維修建議 · 保養追蹤
- Case signalSensor settings and thresholdsSource|Case story:The chemical plant brings pump and motor lists, sensor settings and alert thresholds together. Maintenance staff can review condition by area and look up each asset's settings and maintenance records.
TCP/IP over HTTPS- PHM Gateway
- 既有平台 Box
- 本地異常暫存
- PHM Gateway震動 / 溫度 / 電流 · 資料採樣
- 既有平台 Box設備 ID 對應 · 資料緩衝
- 本地異常暫存斷網補傳 · 高頻資料緩衝
Modbus TCP / MQTT / API- 震動感測器
- 溫度感測器
- 電流 / 電表
- 設備狀態
- CasePump and motor lists
- 震動感測器RMS / 頻譜 · 軸承與馬達
- 溫度感測器軸承 / 機殼 · 熱趨勢
- 電流 / 電表負載與運轉 · 異常耗電
- 設備狀態RUN / STOP · 維修紀錄
- Case signalPump and motor listsSource|Case story:The chemical plant brings pump and motor lists, sensor settings and alert thresholds together. Maintenance staff can review condition by area and look up each asset's settings and maintenance records.
Wiring diagrams and hardware configuration.
The diagram outlines data flow between site signals, edge devices, the network and the platform. Confirm installation and connection scope before work begins.
Original diagram notes (Traditional Chinese)
- 01主機櫃 / Main equipment cabinet 內含 24VDC PSU、既有平台 Box、PHM Gateway
- 0224VDC PSU(100~240VAC, 單相 / DC 24V / 5A / 工業電源)以 24VDC 紅虛線供電給 既有平台 Box 與 PHM Gateway
- 03既有平台 Box(IPC / HMI / Switch、本地資料整理、斷網本地暫存)與 PHM Gateway(Sensor I/O / MQTT、設備測點採集)以 Modbus TCP / MQTT 藍線連接
- 04既有平台 Box 上行至 既有平台 Cloud(部署於雲端 / 台灣):TCP/IP over HTTPS via customer LAN(綠線)
- 054× 現場訊號 / 表計 / 感測器資料以橙線接入 PHM Gateway:設備 A(震動 / 溫度,測點 1);設備 B(震動 / 溫度,測點 2);設備 C(電流 / 運轉,測點 3);設備 D(健康狀態,測點 4)
TOTAL既有平台 Box + PHM Gateway + 現場點位 / 表計 / 感測器 = PHM 基準配置
Sensors, PLCs, edge gateways and communication modules are selected around the equipment already available at the site.
Original diagram notes (Traditional Chinese)
- HW-01現場訊號來源設備 / 表計 / 感測器;狀態、數值、事件
- HW-02PHM Gateway接收現場訊號;轉換通訊資料
- HW-03既有平台 Box本地資料整理;斷網暫存 / 上傳
- HW-0424VDC PSU工業電源;低壓供電
- HW-05既有平台 CloudDashboard / 告警 / 報表;角色權限與資料庫
What to confirm before work begins.
This material describes a planning direction. Confirm site points, installation, report definitions and alert rules against actual site conditions.
- 01Site points and signal sources
- 02Communication protocols and network conditions
- 03Power, panels and installation method
- 04Report fields and data definitions
- 05Alert rules and responsible people
- 06Equipment brands, models and quantities
END · Next step
What would you most like to solve on site?
An equipment list, a panel photo or a problem you face every day is enough to start.
- 01An equipment list
- 02A panel photo
- 03A problem you face every day


