iAndon Implementation Planning for an Overseas Factory
A6.iAndonOverseas manufacturing

iAndon Implementation Planning for an Overseas Factory

The Taiwan office can check last night's overseas output, too.

Case ID
IANDON-01
Module
A6.iAndon
Application
Overseas manufacturing
Industry
Fastener manufacturer with an overseas plant
  • Overseas plant
  • Production board
  • Downtime analysis
SHEET 01 · Case story

The Taiwan office can check last night's overseas output, too.

At an overseas fastener plant, Modbus collects machine RUN/STOP signals. Work-order and shift data are shown alongside output and downtime records, giving teams in different time zones a shared reference for queries.

SHEET 02 · Challenge and response

From the site problem to a system approach.

  1. 01The challenge

    Managing multiple shifts, languages and sites can delay updates about downtime, output and handovers.

  2. 02The system approach

    Create a machine overview, downtime reasons, work-order schedule and large Andon board so the floor and office can view the same data.

  3. 03Reported outcome

    Managers can get a clearer view of exceptions, shift handovers and scheduling gaps.

SHEET 03 · Architecture

System architecture and data flow.

The machine-signal Node collects machine contact signals and work-order data; the existing platform handles alerts, boards and reports. Source diagrams retain some original Traditional Chinese labels.

L4應用層Application
L3 → L4:REST API · WebSocket · LINE Webhook
L3雲端層Cloud
L2 → L3:TCP/IP over HTTPS
L2邊緣層Edge
L1 → L2:Modbus TCP / MQTT / API
L1感測層Sensing
Data flows upward
    • 工廠 Dashboard
    • Andon 大看板
    • LINE / Email 推播
    • Excel 報表
    • CaseTaiwan office check
    • Overview
    • Dashboard
    • Downtime History
    • Database
    • Production Reports
    • CaseOutput and downtime records
    • iAndon Node
    • 既有平台 Box
    • 斷網本地暫存
    • 機台 / PLC 狀態
    • 產量計數
    • 工單 / 排程資料
    • 停機原因輸入
    • CaseModbus RUN/STOP
    • CaseWork-order and shift data
SHEET 04 · Wiring and hardware

Wiring diagrams and hardware configuration.

The diagram outlines data flow between site signals, edge devices, the network and the platform. Confirm installation and connection scope before work begins.

Original diagram notes (Traditional Chinese)
  1. 01主機櫃 / Main equipment cabinet 內含 24VDC PSU、既有平台 Box、iAndon Node
  2. 0224VDC PSU(100~240VAC, 單相 / DC 24V / 5A / 工業電源)以 24VDC 紅虛線供電給 既有平台 Box 與 iAndon Node
  3. 03既有平台 Box(IPC / HMI / Switch、本地資料整理、斷網本地暫存)與 iAndon Node(DI / AI / Modbus、現場訊號採集)以 Modbus TCP / MQTT 藍線連接
  4. 04既有平台 Box 上行至 既有平台 Cloud(部署於雲端 / 台灣):TCP/IP over HTTPS via customer LAN(綠線)
  5. 054× 現場訊號 / 表計 / 感測器資料以橙線接入 iAndon Node:產線 A(PLC / 光電 / 計數,DI-1);產線 B(PLC / 光電 / 計數,DI-2);產線 C(PLC / 光電 / 計數,DI-3);產線 D(PLC / 光電 / 計數,DI-4)

TOTAL既有平台 Box + iAndon Node + 現場點位 / 表計 / 感測器 = iAndon 基準配置

Original diagram legend藍線 = Ethernet / Modbus TCP / TCP-IP;綠線 = HTTPS / TCP-IP (Cloud Uplink);橙線 = 乾接點 / 計數脈波 / PLC 狀態訊號;紅虛線 = 24VDC Power / 低壓電源Planning reference with Traditional Chinese labels. Confirm wire colors, terminals, power and communications against site-approved documents.
SHEET 05 · Before implementation

What to confirm before work begins.

This material describes a planning direction. Confirm site points, installation, report definitions and alert rules against actual site conditions.

  1. 01Site points and signal sources
  2. 02Communication protocols and network conditions
  3. 03Power, panels and installation method
  4. 04Report fields and data definitions
  5. 05Alert rules and responsible people
  6. 06Equipment brands, models and quantities

END · Next step

What would you most like to solve on site?

An equipment list, a panel photo or a problem you face every day is enough to start.